Taipei Lin-sen South Road Underpass, Fon-kang Tunnel of Western Coastal Expressway, Taipei Cheng-chou Road Underground Street, Taipei Main station, Wan-hwa, Pan-chiao, Sung-shan and Extension Tunnel Across Hsintien River of Taipei Underground Railroad, Taipei MRT Tan-Shui Line including Taipei Railway Station and Chung-shan Station, Nan-kang Line, Kaohsiung MRT
|
MRT Kaohsiung System - CR4, CR6 2 Sections ( Design Build ), Taiwan
 |
|
- CR4 3.12 KM : 1 station, 3 Cut-and-Cover Tunnel Sections, 2 Shild Tunnel Sections And Water, Power, Fire, AC system, etc.
- CR6 3.83 KM : 2 stations, Cut-and-Cover Tunnel, 3 Shild Tunnel Sections, NATM Tunnel, And Water, Power, Fire, AC system, etc.
- Executing Period : Nov. 2001 ~ Sep. 2007
| |
CD551 Section of Tu-cheng Line in Taipei MRT System
 |
|
- 3 Stations by Cut-Cover Method, Shield Tunnel 5,455 M by 3 Sections, and Crossing line 130 M
- Contract Sum : NT$ 4,704,612,182
- Executing Period : May 1999 ~ Mar. 2006
| |
Taipei Cheng-chou Rd. Underground Street Project
 |
|
- Taipei Cheng-chou Rd. Underground Shopping Mall Project
- Length: 824 M
- Slurry Wall and Cut-Cover Method, Structure for Civic Blvd. Expressway Bridge also
- Executing Period : Nov. 1992 ~ Feb. 2000
| |
|
|
 |
|