Taipei Ming-chuan Road and Cheng-kuo Noth Road Sewage Tunnel, Ming-chu Road Sewage Tunnel, Fu-yuan Street Sewage Tunnel, Kaohsiung Chen-kung Road Sewage Tunnel, Taipei Suburb Sewage Tunnel, Sub-Pipe Gingmei - Mujhia Sewage Tunnel, Taipei Shuang-hsi Sewage Tunnel Main Pipe, Tunnel of Hsiao-nan-men Station for Taipei MRT Nan-kang Line, 4th Nuclear Power Plant Circulating Water Undersea Tunnel, Kaohsiung MRT Project, Taipei MRT Shin-chong Line and Lu-chou Line Projects
|
CK570E Section of Shin-chong Line in Taipei MRT System
 |
|
- 3 Cut-and-Cover Stations, and Shield Tunnel 7,273 M, Crossing line 150 M
- Contract Sum : NT$ 2,800,662,82 (JV) RSEA Joint 49%
- Executing Period : Sep. 2001 ~ Aug. 2011( Est )
| |
Nuclear Power Plant No.4
 |
|
- JV contract
- Works on the bank:include connecting culvert and 2 working wells (53 m excavation depth, 17 m internal diameter hollow RC cylinder)
- Tunnel works: 2 under sea tunnels of length 1320 m, inner diameter 6.7 m.
- Works on the Sea: including 2 reaching wells(21m diameter SRC structure), 2 Drain off water head (17.3m diameter, 4.9 m height steel head) , and drain off water head protection work
- Contract Sum: NT$3,288,378,714