RSEA has undertaken 496 bridge projects and total 158,863.14Km in length, the major projects including as follows:
- Domestic
- Chian Niao Bridge, Yi-li Bridge, Hou-feng Bridge, Taipei Hwa-chiang Bridge, Taichung Ta-tu River Bridge, Taipei Bridge, Taipei Chung -cheng Bridge, Li-wu Bridge and Ho-ping Bridge of Northern Link Railroad, Kao-ping Bridge, Taipei Chung-shiao Bridge, Chung-chang Bridge, Tzu-chiang Bridge, Kuantu Extension Bridge, Taipei Ming-chuan Bridge, Shuang-yuan Bridge, Taipei Da-han Bridge, Kao-ping River Bridge, Houlung River Bridge, Western Coastal Bridge, Taipei Chong-shin Bridge, Ming-tan headwater Arch Bridge, Taipei Chung-shin Bridge, Shih-pa-wang-kung Coastal Bridge, Taipei Hua-Tsui Bridge, Ken-jin Bridge, Hua-lien Taroko Gorge Bridge, Chung-sha Bridge extention project, New Silo Bridge
- Overseas
- Bridges on Jizan Road, Bridges on Sha'ar Descent and Dina, Road Project and Bridges on Al Baha Bilad Zahazan Feeder Road Project, Saudi Arabia; Bridges on wahtambang-Lubuklinggau Highway, and Bridges on Surabaya-Malang Expressway Project, Indonesia; Newton Interchange Flyover Project, Woods Vlle Interchange Flyover and Braddel Road Interchange Turnkey Project, Singapore
|
Taipei-Yilan Expressway Project , From Toucheng to Su’ao
 |
|
- C510 Section, C511 Section, C512 Section and C515 Section were completed by RSEA
- Total length:17.603 KM of overpass bridge
- Working method:Precast Segmental Construction Method, Incremental Launching Method, Advancing Shoring Bridge Construction Method, Balanced Cantilever Method..etc.
- Executing period:July 2001 ~ Jan 2006
| |
Taroko Bridge Project in Hualian, Taiwan
 |
|
- Stretch Province Road No. 9 of Taiwan from S curve to straight line, improve the traffic widely.
- Total length:2.4 KM
- Nelson Steel Arched Bridge designed as a simple supported beam, is a Magnificent viewed bridge of the east coast of Taiwan
- Executing Period:Feb 1999 ~June 2002
| |
Canjin Bridge Project in Taoyuan, Taiwan
 |
|
- Magnificent Viewed Bridge Overpass Dahan river
- Total length is 806 m, the bridge length is 776 m, the approach length of both ends is 30 m, four lanes with two in each way.
- 18 span design, 3 central spans are 270m Steel Arched Bridge, domestically and firstly a continuously Wired Steel Arched Bridge.
- Center span is 150 m long.
- Executing Period:April 2000 ~Aug 2002
| |
New Jhongsing Bridge Project in Taipei
 |
|
- Main bridge:1,138m in Length , 22.5 m in Width
- Approach ramp:2,311 m
- Contract Sum:US$40,378,000
- Executing Period:Oct 1986 ~Nov 1988
| |
Taiwan Friendship Bridge of Costa Rica(Puente de la Amistad)
 |
|
- Total length:780 m (compound type of 260m Cable-stayed bridges and 520m approaching bridges)
- Main tower:Shelf type RC columns,76m high
- Contract Sum:US$26,900,000
- Executing Period:Mar 2000 ~ Dec 2002
| |
Newton Overpass Bridge Project in Singapore
 |
|
- Length:550 m
- Contract Sum:US$2,459,995
- Executing Period:Nov 1978~April 1980
| |
|
|
 |
|